What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 54 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Pivot Kemsley | £105.50 |
| 2 | Nursling | £105.07 |
| 3 | Tye Lane | £104.75 |
| 4 | Zenobe Capenhurst #4 | £104.00 |
| 5 | SSE Energy Supply #01 | £96.19 |
| 6 | Lakeside | £88.55 |
| 7 | Pen y Cymoedd | £88.42 |
| Region | £/MWh |
|---|---|
| South Eastern | £105.5 |
| Merseyside and North Wales | £104.0 |
| Eastern | £103.9 |
| Southern | £103.5 |
| South Wales | £88.4 |
| Yorkshire | £74.1 |
| North Western | £73.0 |