What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 44 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Pen y Cymoedd | £57.50 |
| 2 | Farnham | £57.50 |
| 3 | Lakeside | £57.47 |
| 4 | Broadditch | £56.60 |
| 5 | SSE Energy Supply #01 | £54.38 |
| 6 | ClayTye Farm 1 | £53.78 |
| 7 | Oldham | £52.78 |
| Region | £/MWh |
|---|---|
| South Wales | £57.5 |
| Merseyside and North Wales | £50.3 |
| South Western | £49.8 |
| Eastern | £48.7 |
| Southern | £46.9 |
| Midlands | £46.7 |
| South Eastern | £36.8 |
| North Western | £32.0 |
| Yorkshire | £31.5 |