What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 67 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | EDF Energy F01C | £69.26 |
| 2 | Nursling | £68.89 |
| 3 | Tye Lane | £68.54 |
| 4 | Cowley | £68.00 |
| 5 | Zenobe Capenhurst #4 | £67.65 |
| 6 | Pen y Cymoedd | £65.53 |
| 7 | SSE Energy Supply #01 | £65.47 |
| Region | £/MWh |
|---|---|
| Merseyside and North Wales | £67.6 |
| Eastern | £66.5 |
| South Wales | £65.5 |
| Southern | £63.2 |
| Midlands | £53.0 |
| South Eastern | £42.2 |
| Northern | £36.6 |
| North Western | £32.2 |
| Yorkshire | £29.1 |