What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 49 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Dong Severn Ut 10 | £27.37 |
| 2 | Shoreham | £25.25 |
| 3 | Damhead Creek | £25.25 |
| 4 | Rocksavage | £23.04 |
| 5 | Carrington Ltd - 2 | £21.31 |
| 6 | Kings Lynn A | £20.00 |
| 7 | THURROCK STORAGE #3 | £19.15 |
| Region | £/MWh |
|---|---|
| South Eastern | £16.5 |
| North Western | £15.0 |
| Midlands | £15.0 |
| Eastern | £13.9 |
| Southern | £13.5 |
| Northern | £11.8 |
| Yorkshire | £11.7 |