What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 43 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Dong Severn Ut 10 | £23.06 |
| 2 | Shoreham | £21.36 |
| 3 | Carrington Ltd - 2 | £20.81 |
| 4 | Rocksavage | £19.50 |
| 5 | Seabank Module 2 | £18.00 |
| 6 | THURROCK STORAGE #3 | £16.64 |
| 7 | Centrica Business Solutions S05L | £13.58 |
| Region | £/MWh |
|---|---|
| South Eastern | £16.4 |
| Yorkshire | £13.3 |
| North Western | £12.8 |
| Eastern | £11.2 |
| Northern | £10.5 |
| Southern | £9.8 |