What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 25 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Dong Severn Ut 10 | £24.74 |
| 2 | Grain | £22.67 |
| 3 | Cottam Development Centre | £22.64 |
| 4 | Damhead Creek | £21.79 |
| 5 | Farnham | £21.31 |
| 6 | Didcot B main 5 | £20.67 |
| 7 | Rocksavage | £18.75 |
| Region | £/MWh |
|---|---|
| South Eastern | £18.1 |
| North Western | £16.3 |
| Southern | £13.9 |
| South Western | £12.0 |
| Eastern | £12.0 |
| Midlands | £11.7 |