What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 66 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | GridBeyond L0EN | £200.70 |
| 2 | GridBeyond L0DN | £168.68 |
| 3 | Flexitricity #09 | £152.65 |
| 4 | Dong Severn Ut 10 | £140.01 |
| 5 | Ferrybridge-1 | £139.25 |
| 6 | Dong Severn Ut 20 | £139.05 |
| 7 | Ferrybridge-2 | £138.10 |
| Region | £/MWh |
|---|---|
| Yorkshire | £138.2 |
| East Midlands | £137.4 |
| South Scotland | £128.9 |
| North Scotland | £127.8 |
| South Eastern | £119.6 |
| Eastern | £117.3 |
| Southern | £116.9 |
| Midlands | £116.6 |