What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 61 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | GridBeyond L0EN | £249.16 |
| 2 | GridBeyond L0DN | £209.41 |
| 3 | Didcot B main 5 | £189.53 |
| 4 | Flexitricity #09 | £178.57 |
| 5 | Holes Bay | £172.89 |
| 6 | BGI Trading #01 | £172.88 |
| 7 | BGI Trading #01 | £172.88 |
| Region | £/MWh |
|---|---|
| Southern | £172.9 |
| Yorkshire | £172.9 |
| East Midlands | £169.2 |
| South Scotland | £166.4 |