What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 82 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | GridBeyond L0EN | £37.36 |
| 2 | Skelmersdale | £32.33 |
| 3 | Brigg | £32.28 |
| 4 | Ffestiniog | £32.05 |
| 5 | Chapel Farm | £32.00 |
| 6 | ClayTye Farm 2 | £31.67 |
| 7 | Ferrybridge-1 | £30.72 |
| Region | £/MWh |
|---|---|
| North Western | £32.2 |
| Yorkshire | £30.6 |
| South Scotland | £30.1 |
| South Eastern | £29.5 |
| Midlands | £29.5 |
| Southern | £29.0 |
| Eastern | £29.0 |
| South Wales | £28.9 |
| South Western | £27.8 |