What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 72 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | GridBeyond L0EN | £28.13 |
| 2 | Didcot B main 5 | £25.93 |
| 3 | BMUid for Sutton Bridge | £24.17 |
| 4 | Port of Tyne | £24.00 |
| 5 | Native River | £23.71 |
| 6 | Skelmersdale | £23.35 |
| 7 | Brigg | £23.29 |
| Region | £/MWh |
|---|---|
| South Western | £23.4 |
| North Western | £23.2 |
| Eastern | £23.0 |
| Yorkshire | £22.4 |
| Northern | £22.0 |
| South Eastern | £21.4 |