What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 57 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Optimo Energy T01N | £17.88 |
| 2 | Unit 2 | £9.02 |
| 3 | Bulphan Fen | £6.51 |
| 4 | Monk Fryston | £6.33 |
| 5 | Little Barford main 1 | £6.30 |
| 6 | GridBeyond L0EN | £6.06 |
| 7 | Lakeside | £6.00 |
| Region | £/MWh |
|---|---|
| Eastern | £5.6 |
| South Western | £5.5 |
| North Western | £5.4 |
| South Wales | £4.9 |
| Yorkshire | £4.7 |
| East Midlands | £4.7 |
| Merseyside and North Wales | £4.4 |
| Northern | £4.2 |
| Midlands | £4.2 |
| Southern | £3.6 |