What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 20 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Exergy Solutions E00E | £2.56 |
| 2 | BMUid for Sutton Bridge | £2.54 |
| 3 | Grain | £2.49 |
| 4 | F & S Energy #03 | £2.41 |
| 5 | SOUTH HUMBER BANK P/S | £2.38 |
| 6 | Lakeside | £2.33 |
| 7 | Tebworth Park | £2.25 |
| Region | £/MWh |
|---|---|
| Yorkshire | £2.3 |
| Eastern | £2.0 |
| Midlands | £2.0 |
| South Western | £1.9 |
| Southern | £1.8 |