What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 11 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Exergy Solutions E00E | £5.67 |
| 2 | Grain | £5.43 |
| 3 | UKPR S East | £5.00 |
| 4 | Lakeside | £4.88 |
| 5 | Tebworth Park | £4.36 |
| 6 | Ocker Hill | £4.03 |
| 7 | UKPR East Mids | £4.00 |