What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 23 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Tye Lane | £6.60 |
| 2 | Seabank Module 2 | £6.47 |
| 3 | F & S Energy #03 | £6.24 |
| 4 | Flexitricity #09 | £5.76 |
| 5 | SUNDON | £5.64 |
| 6 | THURROCK STORAGE #1 | £5.30 |
| 7 | EDFE Aggregate S Eng 02 | £5.03 |
| Region | £/MWh |
|---|---|
| Eastern | £5.0 |
| Northern | £4.2 |
| Yorkshire | £3.9 |
| South Eastern | £3.9 |
| Midlands | £3.2 |
| Merseyside and North Wales | £3.1 |
| Southern | £3.0 |