What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 24 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Didcot B main 5 | £15.50 |
| 2 | Seabank Module 2 | £12.69 |
| 3 | F & S Energy #03 | £12.38 |
| 4 | Flexitricity #09 | £11.40 |
| 5 | Tye Lane | £10.32 |
| 6 | SUNDON | £8.50 |
| 7 | Pivot Coventry | £8.32 |
| Region | £/MWh |
|---|---|
| Eastern | £8.4 |
| Midlands | £7.9 |
| Merseyside and North Wales | £7.5 |
| South Western | £6.9 |
| Yorkshire | £5.2 |
| North Western | £4.8 |
| South Eastern | £4.8 |
| Southern | £3.8 |