What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 48 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | EDFE Aggregate N Scot 1 | £23.82 |
| 2 | Thame Road | £22.89 |
| 3 | UKPR S East | £22.07 |
| 4 | UKPR East Mids | £21.33 |
| 5 | Ocker Hill | £20.81 |
| 6 | UKPR MANW | £20.61 |
| 7 | Tye Lane | £20.35 |
| Region | £/MWh |
|---|---|
| Midlands | £20.8 |
| Eastern | £20.3 |
| Merseyside and North Wales | £19.4 |
| Yorkshire | £19.4 |
| South Eastern | £19.3 |
| South Wales | £19.2 |
| South Western | £18.8 |
| Northern | £18.6 |
| Southern | £18.1 |