What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 34 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | EDFE Aggregate N Scot 1 | £26.78 |
| 2 | Thame Road | £24.76 |
| 3 | UKPR S East | £24.57 |
| 4 | UKPR East Mids | £23.94 |
| 5 | UKPR MANW | £22.58 |
| 6 | Larks Green | £21.89 |
| 7 | SUNDON | £21.89 |
| Region | £/MWh |
|---|---|
| Eastern | £22.5 |
| South Western | £21.9 |
| Southern | £21.2 |
| South Eastern | £20.9 |
| Midlands | £18.7 |
| North Scotland | £18.7 |