What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 12 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Carnegie Road 1 | £23.90 |
| 2 | ClayTye Farm 2 | £23.05 |
| 3 | Swangate | £21.00 |
| 4 | Limejump Energy #04 | £20.40 |
| 5 | Native River | £20.19 |
| 6 | Hunningley Stairfoot | £20.00 |
| 7 | Pen y Cymoedd | £19.43 |
| Region | £/MWh |
|---|---|
| Merseyside and North Wales | £23.9 |
| Yorkshire | £21.0 |
| South Western | £20.2 |
| Eastern | £20.1 |
| South Wales | £19.4 |
| Southern | £17.8 |