What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 28 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Hunningley Stairfoot | £17.50 |
| 2 | Hawthorn Pit | £13.50 |
| 3 | EDFE Aggregate N Scot 1 | £11.92 |
| 4 | Pen y Cymoedd | £11.31 |
| 5 | Swangate | £8.53 |
| Region | £/MWh |
|---|---|
| Northern | £13.5 |
| South Wales | £11.3 |
| Yorkshire | £9.2 |