What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | BESS Holdco 2 EN7H | £67.45 |
| 2 | SSE Energy Supply #01 | £22.65 |
| 3 | Lakeside | £22.06 |
| 4 | Hirwaun | £18.09 |
| 5 | Ocker Hill | £18.09 |
| 6 | Ffestiniog | £18.09 |
| 7 | Bloxwich | £5.37 |
| Region | £/MWh |
|---|---|
| Southern | £67.5 |
| Yorkshire | £22.1 |
| South Wales | £18.1 |
| Midlands | £17.7 |