What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 5 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | BESS Holdco 2 EN7H | £87.00 |
| 2 | BESS Holdco 2 N03J | £86.38 |
| 3 | Lakeside | £24.39 |
| 4 | Octopus Energy #00 | £22.94 |
| 5 | Ocker Hill | £19.23 |
| 6 | Ffestiniog | £18.94 |
| 7 | Hirwaun | £17.17 |
| Region | £/MWh |
|---|---|
| Southern | £87.0 |
| Yorkshire | £21.6 |
| Midlands | £17.9 |
| South Wales | £17.2 |