What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 25 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Marchwood | £15.67 |
| 2 | Brigg | £11.75 |
| 3 | GridBeyond L02E | £9.99 |
| 4 | GridBeyond L08H | £9.99 |
| 5 | Spalding | £8.98 |
| 6 | EDFE Aggregate S Eng 02 | £8.64 |
| 7 | Rocksavage | £8.55 |
| Region | £/MWh |
|---|---|
| Yorkshire | £11.7 |
| Eastern | £8.2 |
| South Eastern | £7.9 |
| Southern | £6.5 |