What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 39 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Roosecote | £15.27 |
| 2 | GridBeyond L02E | £14.35 |
| 3 | GridBeyond L08H | £14.35 |
| 4 | Spalding | £13.08 |
| 5 | Rocksavage | £12.53 |
| 6 | Broadditch | £11.75 |
| 7 | Lakeside | £11.50 |
| Region | £/MWh |
|---|---|
| North Western | £15.3 |
| South Eastern | £11.7 |
| Yorkshire | £11.5 |
| Midlands | £10.5 |
| Southern | £10.3 |
| South Scotland | £10.0 |
| South Wales | £7.7 |