What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 20 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Cottam Development Centre | £8.53 |
| 2 | Enfield Centre Ltd BMU1 | £8.50 |
| 3 | Centrica Business Solutions S06B | £6.59 |
| 4 | Holes Bay | £5.64 |
| 5 | Ocker Hill | £4.54 |
| 6 | Skelmersdale | £4.48 |
| 7 | GridBeyond L02E | £4.37 |