What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 63 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Little Barford main 1 | £33.00 |
| 2 | Unit 2 | £32.54 |
| 3 | Didcot B main 6 | £32.39 |
| 4 | Seabank Module 2 | £30.25 |
| 5 | Kings Lynn A | £29.42 |
| 6 | SOUTH HUMBER BANK P/S | £25.87 |
| 7 | Limejump Energy #04 | £25.54 |
| Region | £/MWh |
|---|---|
| South Wales | £24.4 |
| South Western | £24.0 |
| Southern | £23.8 |
| Eastern | £22.7 |
| South Eastern | £22.1 |
| Merseyside and North Wales | £22.1 |
| North Western | £22.0 |
| Yorkshire | £21.9 |
| Midlands | £21.7 |
| East Midlands | £19.5 |