What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 25 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Keadby-2 Main | £20.00 |
| 2 | Marchwood | £20.00 |
| 3 | SOUTH HUMBER BANK P/S | £16.36 |
| 4 | Carrington Ltd - 2 | £15.46 |
| 5 | Exergy Solutions E00E | £14.71 |
| 6 | Connah's Quay | £13.14 |
| 7 | Lakeside | £13.00 |
| Region | £/MWh |
|---|---|
| Yorkshire | £13.0 |
| Eastern | £9.0 |
| Southern | £8.4 |
| South Western | £8.4 |
| South Wales | £8.4 |
| North Western | £8.2 |