What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 23 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Keadby-2 Main | £20.52 |
| 2 | Unit 2 | £19.28 |
| 3 | Cottam Development Centre | £18.65 |
| 4 | SOUTH HUMBER BANK P/S | £15.61 |
| 5 | Carrington Ltd - 2 | £14.42 |
| 6 | Lakeside | £12.40 |
| 7 | Exergy Solutions E00E | £12.00 |