What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 56 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Enfield Centre Ltd BMU1 | £25.27 |
| 2 | Peterhead Block 1 | £20.21 |
| 3 | Kings Lynn A | £19.00 |
| 4 | Seabank Module | £18.00 |
| 5 | GridBeyond L0DN | £17.18 |
| 6 | Carrington Ltd - 2 | £13.64 |
| 7 | Exergy Solutions E00E | £13.00 |
| Region | £/MWh |
|---|---|
| North Scotland | £7.9 |
| Southern | £6.5 |
| Yorkshire | £6.3 |
| South Western | £6.0 |
| Eastern | £6.0 |
| Midlands | £5.1 |
| South Scotland | £4.7 |