What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 36 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Enfield Centre Ltd BMU1 | £26.05 |
| 2 | Peterhead Block 1 | £19.55 |
| 3 | GridBeyond L0DN | £15.65 |
| 4 | Exergy Solutions E00E | £12.38 |
| 5 | Carrington Ltd - 2 | £11.07 |
| 6 | Flexitricity #04 | £2.63 |
| 7 | Flexitricity #03 | £2.61 |