What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 48 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | SUNDON | £10.03 |
| 2 | Pivot Coventry | £9.55 |
| 3 | EDFE Aggregate S Eng 02 | £9.12 |
| 4 | Ocker Hill | £8.46 |
| 5 | Pivot Bustleholme | £8.16 |
| 6 | BMUid for Sutton Bridge | £7.93 |
| 7 | Wolverhampton West | £7.72 |
| Region | £/MWh |
|---|---|
| Midlands | £8.2 |
| Eastern | £7.6 |
| South Eastern | £6.6 |
| Yorkshire | £6.0 |
| South Wales | £5.9 |
| Southern | £5.7 |