What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 55 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | EPG Energy #03 | £6.63 |
| 2 | Ocker Hill | £6.58 |
| 3 | EPG Energy #02 | £6.52 |
| 4 | SUNDON | £6.33 |
| 5 | EPG Energy #01 | £6.29 |
| 6 | BMUid for Sutton Bridge | £6.29 |
| 7 | Pivot Kemsley | £6.00 |
| Region | £/MWh |
|---|---|
| South Wales | £5.4 |
| East Midlands | £5.1 |
| Midlands | £5.1 |
| Yorkshire | £4.7 |
| Southern | £4.7 |
| Eastern | £4.4 |
| South Eastern | £3.9 |