What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 19 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Centrica Business Solutions S05L | £33.35 |
| 2 | Keadby-2 Main | £23.61 |
| 3 | EDF Energy F01C | £18.53 |
| 4 | Dinorwig | £16.71 |
| 5 | Capenhurst | £15.25 |
| 6 | BESS Holdco 2 EN7H | £14.00 |
| 7 | Pillswood 2 | £13.83 |
| Region | £/MWh |
|---|---|
| Merseyside and North Wales | £15.2 |
| Southern | £14.0 |
| South Eastern | £12.4 |
| Yorkshire | £11.6 |
| Eastern | £11.5 |
| Midlands | £8.1 |
| South Western | £7.1 |