What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 53 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Limejump Energy #04 | £109.87 |
| 2 | Ilmer Lane | £109.00 |
| 3 | Gerrards Cross | £108.75 |
| 4 | Tollgate | £108.46 |
| 5 | Farnham | £108.44 |
| 6 | THURROCK STORAGE #1 | £108.38 |
| 7 | Statkraft Markets #01 | £103.00 |
| Region | £/MWh |
|---|---|
| Yorkshire | £98.5 |
| South Eastern | £95.6 |
| Eastern | £91.4 |
| South Wales | £90.8 |
| South Western | £87.5 |
| Midlands | £86.3 |
| East Midlands | £79.9 |
| Southern | £77.9 |