What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 89 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Pillswood 2 | £25.89 |
| 2 | Danske Commodities A/S K01H | £24.82 |
| 3 | Contego | £23.17 |
| 4 | Thame Road | £23.16 |
| 5 | Ilmer Lane | £23.16 |
| 6 | Immingham | £22.99 |
| 7 | Torquay | £22.67 |
| Region | £/MWh |
|---|---|
| Yorkshire | £23.9 |
| Eastern | £23.1 |
| Midlands | £21.9 |
| Southern | £21.4 |
| South Eastern | £21.4 |
| East Midlands | £21.3 |