What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 58 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Marchwood | £27.99 |
| 2 | Brigg DG | £27.55 |
| 3 | Richborough Park 2 | £26.67 |
| 4 | Monk Fryston | £26.05 |
| 5 | Lakeside | £26.05 |
| 6 | Limejump Energy #03 | £26.00 |
| 7 | Brigg DG-2 | £25.45 |
| Region | £/MWh |
|---|---|
| Midlands | £24.3 |
| Yorkshire | £22.6 |
| North Western | £22.3 |
| South Wales | £21.6 |
| South Eastern | £21.5 |
| Merseyside and North Wales | £21.2 |
| Eastern | £19.6 |
| Southern | £18.3 |
| East Midlands | £16.2 |