What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 21 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Unit 2 | £5.32 |
| 2 | Brigg | £4.32 |
| 3 | Holes Bay | £4.17 |
| 4 | Centrica Business Solutions S05L | £4.00 |
| 5 | Lakeside | £3.95 |
| 6 | UKPR MANW | £3.75 |
| 7 | Native River | £3.74 |
| Region | £/MWh |
|---|---|
| Southern | £4.2 |
| Yorkshire | £3.7 |
| South Western | £3.7 |
| South Wales | £3.6 |
| Northern | £3.5 |
| Eastern | £3.4 |
| East Midlands | £3.3 |
| North Western | £2.9 |
| Midlands | £2.9 |