What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 30 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | ECOTRICITY C05L | £8.74 |
| 2 | UKPR S East | £6.27 |
| 3 | UKPR MANW | £6.24 |
| 4 | UK Power Reserve #08 | £6.23 |
| 5 | UKPR East Mids | £6.00 |
| 6 | Cottam Development Centre | £5.88 |
| 7 | West Burton B 2 | £5.85 |
| Region | £/MWh |
|---|---|
| Southern | £5.5 |
| South Wales | £5.3 |
| Eastern | £5.1 |
| Yorkshire | £4.6 |
| Midlands | £3.9 |