What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 35 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | GridBeyond L0DN | £50.27 |
| 2 | GridBeyond L0EN | £50.27 |
| 3 | Centrica Business Solutions S05L | £35.29 |
| 4 | BGI Trading #1 | £18.26 |
| 5 | Ferrybridge-1 | £17.75 |
| 6 | Arbroath | £15.88 |
| 7 | Brigg | £15.57 |
| Region | £/MWh |
|---|---|
| North Western | £18.3 |
| Yorkshire | £15.6 |
| North Scotland | £12.6 |
| Eastern | £9.3 |
| South Eastern | £9.0 |
| Southern | £9.0 |
| South Western | £8.2 |
| South Scotland | £7.9 |