What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 50 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Didcot B main 5 | £28.61 |
| 2 | Holes Bay | £18.43 |
| 3 | Ferrybridge-1 | £14.45 |
| 4 | Bulphan Fen | £12.36 |
| 5 | EDF Aggregated Unit 05 | £11.54 |
| 6 | Brigg | £11.43 |
| 7 | Pivot Coventry | £10.63 |
| Region | £/MWh |
|---|---|
| Southern | £18.4 |
| Eastern | £12.1 |
| Yorkshire | £11.5 |
| Midlands | £10.6 |
| South Eastern | £10.5 |
| South Wales | £6.4 |
| South Western | £6.1 |