What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 39 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | GridBeyond L0DN | £913.29 |
| 2 | GridBeyond L0EN | £913.29 |
| 3 | Ferrybridge-2 | £670.75 |
| 4 | Farnham | £628.33 |
| 5 | Contego | £628.32 |
| 6 | Ilmer Lane | £628.32 |
| 7 | Chapel Farm | £628.32 |
| Region | £/MWh |
|---|---|
| Yorkshire | £670.8 |
| South Eastern | £628.3 |
| Eastern | £628.3 |
| North Western | £628.3 |
| Southern | £628.3 |
| South Scotland | £557.1 |