What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 33 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | GridBeyond L0DN | £10.08 |
| 2 | GridBeyond L0EN | £10.08 |
| 3 | Blackpool | £8.08 |
| 4 | Immingham | £8.08 |
| 5 | Skelmersdale | £8.00 |
| 6 | Jamesfield 2 | £8.00 |
| 7 | ClayTye Farm 2 | £7.50 |
| Region | £/MWh |
|---|---|
| North Scotland | £5.4 |
| Eastern | £5.0 |
| South Wales | £4.7 |
| Yorkshire | £4.4 |
| South Scotland | £4.4 |
| South Eastern | £4.1 |
| Northern | £3.8 |
| North Western | £3.7 |
| Southern | £3.6 |