What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 57 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | GridBeyond L0EN | £28.15 |
| 2 | West Burton B 3 | £18.87 |
| 3 | Dinorwig | £17.24 |
| 4 | Cottam Development Centre | £14.34 |
| 5 | GridBeyond L0DN | £12.37 |
| 6 | Farnham | £12.36 |
| 7 | THURROCK STORAGE #3 | £12.04 |
| Region | £/MWh |
|---|---|
| Southern | £12.4 |
| Yorkshire | £11.0 |
| South Eastern | £8.8 |
| North Western | £8.5 |
| Eastern | £8.2 |