What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 47 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | GridBeyond L0EN | £33.81 |
| 2 | BMUid for Sutton Bridge | £18.85 |
| 3 | BroxburnBattery | £16.76 |
| 4 | Skelmersdale | £14.40 |
| 5 | GridBeyond L0DN | £11.76 |
| 6 | Farnham | £10.73 |
| 7 | Chapel Farm | £10.25 |
| Region | £/MWh |
|---|---|
| South Scotland | £16.8 |
| North Western | £14.4 |
| Southern | £10.7 |
| Eastern | £10.0 |