What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 35 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | GridBeyond L0EN | £434.15 |
| 2 | BMUid for Sutton Bridge | £193.03 |
| 3 | Skelmersdale | £106.69 |
| 4 | Chapel Farm | £62.90 |
| 5 | BroxburnBattery | £47.00 |
| 6 | Spalding | £34.38 |
| Region | £/MWh |
|---|---|
| North Western | £106.7 |
| Eastern | £62.9 |
| South Scotland | £47.0 |