What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 70 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | GridBeyond L0EN | £52.02 |
| 2 | GridBeyond L0DN | £26.00 |
| 3 | Carrington Ltd - 2 | £21.25 |
| 4 | Unit 2 | £17.55 |
| 5 | SOUTH HUMBER BANK P/S | £16.90 |
| 6 | Ferrybridge-2 | £13.23 |
| 7 | Ferrybridge-1 | £9.26 |
| Region | £/MWh |
|---|---|
| Yorkshire | £11.6 |
| North Western | £8.4 |
| Eastern | £7.1 |