What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 15 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | GridBeyond L0EN | £2382.84 |
| 2 | GridBeyond L0DN | £1222.18 |
| 3 | Skelmersdale | £1096.83 |
| 4 | Unit 2 | £947.97 |
| 5 | SOUTH HUMBER BANK P/S | £919.54 |
| 6 | Little Raith | £497.05 |
| 7 | Chapel Farm | £439.61 |
| Region | £/MWh |
|---|---|
| North Western | £1096.8 |
| South Scotland | £497.1 |
| Eastern | £439.6 |
| South Eastern | £290.7 |