What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 68 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Cottam Development Centre | £39.55 |
| 2 | Ferrybridge-1 | £39.13 |
| 3 | Grain | £38.80 |
| 4 | Connah's Quay | £38.07 |
| 5 | BMUid for Sutton Bridge | £37.83 |
| 6 | Holes Bay | £36.10 |
| 7 | SSE Energy Supply #01 | £34.95 |
| Region | £/MWh |
|---|---|
| Southern | £36.1 |
| Yorkshire | £32.3 |
| Midlands | £31.2 |
| South Western | £30.9 |
| Eastern | £30.6 |
| South Wales | £29.1 |
| South Eastern | £27.1 |
| Northern | £26.5 |
| East Midlands | £24.3 |