What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 30 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Brigg | £19.38 |
| 2 | Centrica Business Solutions S05L | £19.34 |
| 3 | Contego | £9.01 |
| 4 | SUNDON | £6.25 |
| 5 | Spalding | £6.13 |
| 6 | Nursling | £5.67 |
| 7 | ClayTye Farm 2 | £5.59 |
| Region | £/MWh |
|---|---|
| Yorkshire | £19.4 |
| South Eastern | £8.6 |
| Southern | £5.7 |
| Eastern | £5.6 |
| Merseyside and North Wales | £4.2 |
| East Midlands | £3.6 |
| Midlands | £3.3 |