What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 54 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Seabank Module 2 | £38.13 |
| 2 | Dong Severn Ut 20 | £19.04 |
| 3 | Carrington Ltd - 2 | £18.45 |
| 4 | West Burton B 3 | £17.17 |
| 5 | Cottam Development Centre | £16.35 |
| 6 | Brigg | £16.10 |
| 7 | Broadditch | £15.10 |
| Region | £/MWh |
|---|---|
| Yorkshire | £16.1 |
| South Eastern | £14.5 |
| Eastern | £13.2 |
| Southern | £12.5 |