What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 55 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Seabank Module 2 | £17.20 |
| 2 | Staythorpe 2 | £13.33 |
| 3 | Brigg | £11.47 |
| 4 | Centrica Business Solutions S05L | £11.00 |
| 5 | Farnham | £11.00 |
| 6 | Monk Fryston | £10.57 |
| 7 | Lakeside | £10.47 |
| Region | £/MWh |
|---|---|
| North Western | £10.0 |
| Yorkshire | £8.8 |
| South Eastern | £8.1 |
| Eastern | £8.0 |
| East Midlands | £7.6 |
| Southern | £7.6 |
| South Wales | £7.3 |
| Midlands | £7.3 |
| Northern | £6.8 |